List of Figures
Figure 1 – Typical Manpower Loading (percent of maximum) for Process Plant 8
Figure 2 – Typical Manpower Loading (percent of total) for Process Plant 8
Figure 3 – Typical Manpower Loading (percent of maximum) for High-Rise Bldg 9
Figure 4 – Typical Manpower Loading (percent of total) for High-Rise Building 9
Figure 5 – Estimated Direct Construction Field Labor Productivity Form 11
Figure 6 – Completed Productivity Form – Case Study: Three Labor Markets 14
Figure 7 – Completed Productivity Form – Case Study: Foreign Workforce 17
Figure 8 – Completed Productivity Form – Case Study: Petrochemical Plant 19
Figure 9 – Completed Productivity Form – Case Study: Offshore Platform 21
Figure 10 – Completed Productivity Form – Case Study: High-Rise Building 23
Figure 11 – Fps – Project Size Adjustment Factor 43
Figure 12 – Fsh – Construction Schedule Adjustment Factor 44
Figure 13 – Fsr – Additional Safety Requirement Adjustment Factor 45
Figure 14 – Fop – Operating Area Work Adjustment Factor 46
Figure 15 – Fhe – Working Height Adjustment Factor 47
Figure 16 – Fes – Excessive Security Adjustment Factor 48
Figure 17 – Fth – Climate – Temperature/Humidity Adjustment Factor 49
Figure 18 – Fra – Climate – Precipitation Adjustment Factor 53
Figure 19 – Fwc – Climate – Wind Chill Adjustment Factor 55
Figure 20 – Fwn – Climate – Wind Adjustment Factor 56
Figure 21 – Ftv – Travel Time to Construction Site Adjustment Factor 57
Figure 22 – Fec – Construction Activity Adjustment Factor 58
Figure 23 – Fbk – Contractor Backlog Adjustment Factor 59
Figure 24 – Fws – Workforce Supervision Adjustment Factor 60
Figure 25 – Fwk – Work Week Adjustment Factor 62
Figure 26 – Fsd – Shifts per Day Adjustment Factor 63
Figure 27 – Fpb – Workforce Pay Basis Adjustment Factor 64
Figure 28 – Far – Laydown Area Access Adjustment Factor 65
Figure 29 – Fca – Workforce Catering Adjustment Factor 66
Figure 30 – Fac – Workforce Accommodation Adjustment Factor 67
Figure 31 – Faw – Workforce Congestion Adjustment Factor 68
Figure 32 – Fcv – Crew Loading Adjustment Factor 69
Figure 33 – Fsu – Subcontract Labor Adjustment Factor 70
Figure 34 – Fun – Workforce Organization Adjustment Factor 71
Figure 35 – Fwx – Workforce Experience Adjustment Factor 72
Figure 36 – Fcp – Process Trains Learning Curve Adjustment Factor 73
Figure 37 – Fcb – Multistory Building Learning Curve Adjustment Factor 74
Figure 38 – Fwm – Workforce Morale Adjustment Factor 75
Figure 39 – Fwt – Workforce Turnover Adjustment Factor 76
Figure 40 – Fch – Post Construction Start Change Orders Adjustment Factor 77
Figure 41 – Fss – Post Construction Start Stretched Schedule Adjustment Factor 78